Jixi Base Jixilugu DC 1.4GW Hybrid Project Unit 1 100MW CSP
First batch of large-scale scenic base projects in Jilin
100MW CT CSP, 400MW Wind and 200MW PV
Project Overview

The total installed capacity of the Project is 1.4GW, including 400MW PV, 800MW wind power and 200 MW tower CSP. The Project is divided into 2 units, with Tongyu County and Da'an Municipality each plan 100MW CSP.

The 100MW CSP, located in Tongyu County, Baicheng City, Jilin Province, is co-developed and owned by Jilin Electric Power Co., Ltd. and Power China Renewable Energy Co., Ltd. It will use tower CSP technology with an 8-hour molten salt thermal storage and will be connected to the substation of the PV power plant via a 220kV cable after completion.

Cosin Solar won the bid for Solar Field and MSR System equipment supply for the project and will provide advanced Solar field and MSR system and related services for the 100MW CSP part out of the project.


Parameter Introduction
Installed Capacity
100MW
Storage
8 Hours with Molten Salt
Land Area
2.232km2
Solar Field Reflective Area
591,600m2
Heliostat Numbers
19,720
Distance from Ground to the Center of Receiver
210m
Electrical Output
156 GWh/year
Consult Now
Molten Salt Energy Storage System
Tel:0571-86637361
Tower Concentrating Solar Power System
Tel:0571-81119302
PV Tracker System
Tel:0571-86637885